Distributors and Stockholders
Repeatable coil and sheet supply with stable order definitions and export packing.
- GI / GL / PPGI / PPGL
- Coil weight and packing
- Repeat-order alignment
Achetez GI, GL, PPGI, PPGL et acier inoxydable avec revue des spécifications, emballage export et suivi d'expédition. La toiture, l'acier carbone, les tubes, l'aluminium et les câbles restent disponibles dans des bibliothèques dédiées.
RFQ brief builder
Select the product group, supply form, key specification and shipment plan. Your choices continue into the formal RFQ.
Buyer routes
Each route keeps the first product, document and delivery decisions together.
Repeatable coil and sheet supply with stable order definitions and export packing.
Match substrate, coating, paint, feed width and profile geometry before production.
Route mixed materials, inspection documents, packing and phased shipment through one brief.
Priority products
Start with five core product groups for repeat sourcing by distributors, panel manufacturers and project material buyers.

Zinc-coated coil for roll forming, ducting, stockholding and general fabrication.

Aluminum-zinc coated coil for roofing, cladding and hot-climate building envelopes.

Prepainted GI coil specified by substrate, zinc coating, paint system and RAL color.

Prepainted GL coil for corrosion-aware roofing and cladding production.

General-purpose stainless coil specified by grade, finish, thickness and processing route.
Grade, standard, dimensions and end use checked before order confirmation.
Agreed specification
Heat or lot traceability with EN 10204 3.1 MTC when specified.
MTC + heat or lot ID
Processing route, moisture barrier and handling limits matched to the PO.
Inspection + packing records
Packing marks, loading records and commercial documents checked before release.
Loading + document set
Quality and delivery evidence
The inspection scope is agreed against the purchase order. Certificates below show their issuer and stated scope; third-party names do not imply endorsement.
Quality Management
GB/T 19001-2016 / ISO 9001:2015 certificate for Tsingshan Steel (Shandong). Scope covers sales of steel pipes, pipe fittings (fittings, fasteners, flanges), steel and metal valves. Valid through 2027-07-14; CNAS-registered certification body.
Issuer: JXCC / JingXin Certification (Beijing)
Environmental Management
GB/T 24001-2016 / ISO 14001:2015 environmental management system certificate for Tsingshan Steel (Shandong). Scope: environmental management activities related to sales of steel pipes, fittings, steel and metal valves. Valid through 2027-07-14.
Issuer: JXCC / JingXin Certification (Beijing)
Occupational Health & Safety
GB/T 45001-2020 / ISO 45001:2018 OHS management system certificate for Tsingshan Steel (Shandong). Scope: occupational health and safety management activities related to sales of steel pipes, fittings, steel and metal valves. Valid through 2027-07-14.
Issuer: JXCC / JingXin Certification (Beijing)
Applications
Application routes connect product form, exposure, processing and inspection requirements.

GI, GL, PPGI, PPGL and profiled sheet for roofing and wall systems.

Coil, sheet, plate, pipe and profiles routed by forming and fabrication needs.

Structural steel, rebar, plate and pipe for construction and civil projects.

Pipe, plate and corrosion-aware materials selected by service and test scope.
Mill to shipment
Four visible checkpoints keep the purchase order, inspection scope, packing and loading records connected.

Material source, production route or stock preparation aligned to the approved order.

Dimensions, surface, marks and contracted test scope checked before release.

Moisture, edge and handling protection selected for product form and route.

Loading records, securing and shipment documents aligned before dispatch.
Buyer visit records



Demande technique et commerciale
Indiquez le produit, les spécifications, la quantité et la destination. Notre équipe export examinera la demande et répondra par le canal choisi.
Demande envoyée. Nous répondons sous 2 heures ouvrées, ou le jour ouvré suivant hors horaires.
RFQ reference:
Prochaines étapes
Your details are used only to review and respond to this RFQ. Privacy Policy