Steel sourcing & export
Heat Number, Shipping Marks & Packing Traceability
Match the heat on the MTC to the material and bundle marks at receiving. Agree the marking fields, packing list references and loading photo requirements before dispatch.
- Heat/batch identity on MTC when EN 10204 3.1 is ordered
- Shipping marks: PO, size, heat, destination, handling icons as agreed
- Container loading photos for QA archives when required on the order
Specification & process notes
| Item | Detail for RFQ |
|---|---|
| Heat number | Marked on material/tags per product form when the order requires traceability |
| Shipping marks | Content list agreed before packing (buyer marks welcome when provided early) |
| Packing | Seaworthy coil/plate/pipe packing suited to the product; anti-rust measures as specified |
| Evidence | Loading and packing photos can be archived for the contracted lot |
| Documents | Packing list quantities should reconcile with marks and commercial docs |
How we work this inquiry
- Provide mark artwork or required fields before packing starts — late changes cause delays.
- White rust and moisture control for coated/coil products should be stated on the RFQ.
- Traceability depth depends on product form; pipe/plate/coil marking practices differ.
FAQ
Can every bundle show a heat number?
When the order requires heat-level traceability, marks/tags can be coordinated to match the MTC heat/batch. Confirm the rule before packing.
Do you provide container loading photos?
Loading and packing photos can be provided for the contracted lot when requested on the order or inspection plan.
What should shipping marks include?
Common fields: buyer PO, product description, size, heat/batch, net/gross weight, destination, and handling marks. Send your required list with the RFQ.
Related products & links
Specs needed for a quote
Request a Quote — include these details
Complete specifications help us quote accurately. Send at least the grade and standard, size, quantity and destination port so we can include the relevant MTC and packing requirements.